The page you were looking for is not found.

Please use our search engine or navigation above to find the page.




Electrical Works



Read more

Extra-Low Voltage



Read more

Renewable Energy & Smart City Solutions



Read more

Telecommunication Infrastructure



Read more

Industrial Automation



Read more

DIC Solar 748KW Dubai - UAE

the contract's scope of work includes Engineering, Procurement, Design and Construction of a Solar PV On Grid system installed on new Workshop + office in the UAE. The Project total Capacity is 748 KW. The Project is expected to generate 80% of the overall company's energy consumption.



950 KW Solar PV Jordan - Mafraq

The contract's scope of work includes Engineering, Procurement, Design and Construction of a Solar PV Hybrid and Off - Grid system installed at Zaatari and Khaldyiah region. The Project total Capacity is 950 KW which powers up several mechanical loads and Water distribution network.



khaldiyah Solar PV system

The contract's scope of work includes Engineering, Procurement, Design and Construction of a Solar PV On - Grid system installed at Khaldiyah Water Well. The Project total Capacity is 705 KW which powers up the Water Well Pump and its accessories.



Energy management system

The Energy Management System included placing motion sensors in specific locations of the petrol station to provide reduction in energy consumption. In addition to that, we installed a tailored control system that oversees all the lightnings controls, HVAC's monitoring, and water pumping statistics at the service station.



KNPC 9 New Petrol Filling Stations - Solar PV 650KW Project

the contract's scope of work includes Engineering, Procurement, Design and Construction of a Solar PV On Grid system installed on new Petrol Filling Stations in the State of Kuwait. The Project total Capacity is 650 KW. The Project includes both Conventional PV Crystalline modules and BIPV, Building integrated PV, to enhance the overall look on the subject filling stations rooftop and generate more than 30% of the overall station energy consumption.



Du Telecom - Solar PV off grid solution for 20 mobile BTS Sites

Solar panels are the only source of energy significantly reducing the fuel consumption. Whenever excess solar energy is available, it is stored in the battery and retrieved when the sunlight is not fully supplying the load. Odasco Solar system optimizes renewable and hybrid energy solutions according to Du Telecom and site needs. The different energy components are matched to minimize total cost of ownership for various site loads, CAPEX needs, and location specifics.



New Blood Bank Center in Kuwait

Execution, construction, procurement and supply of all materials, equipment, all accessories, connections, controls and all related electrical works, pre-commissioning, commissioning, testing and performance testing and operational and maintenance, spare parts, inclusive of commissioning spares and consumables of the Electrical works, low voltage and special system.



KNPC 9 New Petrol Filling Stations

Works include the provision of, execution, all supervision, labors, constructional plant, erection and construction, procurement and supply of all materials, equipment, all accessories, connections, and all related electrical works, pre-commissioning, commissioning, testing and performance testing and operational and maintenance, spare parts, inclusive of commissioning spares and consumables of the Electrical works, low voltage, special system and BMS System.



Tameer Kuwait Oil Company Head Quarter (Al Ahmadiah, Kuwait)

Full electrical scope of work, Including Low Voltage systems as well. in addition to BMS and control subsystems, the following sub systems :
- HVAC
- Chillers
- Electrical system including medium voltage substation.
- Lighting control.
- Water supply and irrigation.

And interface to the following sub systems :
- Fire alarm system - lifts - Security and access control system



Al-Amiri Hospital Expansion - Electrical works Contract

Works include but is not limited to, the provision of, execution, all supervision, labors, constructional plant, erection and construction, procurement and supply of all materials, equipment, all accessories, connections, controls and all related electrical works, pre-commissioning, commissioning, testing and performance testing and operational and maintenance, spare parts, inclusive of commissioning spares and consumables of the Electrical works, low voltage, special system and BMS System.



Leak Detection System - Al Ain Water Transmission Scheme

Al Ain Water Transmission Scheme (AWTS) Tap Off 9A (FWTS) Pipeline to Al Hayer Tank (Lot P1)Contract No. N-4381B with Astraco.



D20 Electrical Works (Al Jahrah, Kuwait) Ministry Of Electricity and Water Authority - MEW

Construction and maintenance of Fresh/Brakish water towers and Brackish water reinforced concrete ground reservoir 9 M.I.G capacity at D20 site inside Jahra area and annexed works.



Al Jaber - Lusail Towers

- Enhance & reduce the estimated Total connected load in Lusail Towers accompanied with a sound and practical reasons. - Meeting and managing the load estimation acceptance from Lusail Authority.



D20 Instrumentation & Control (Al Jahrah, Kuwait)

Complete SCADA, Control, Communication and Instrumentation package includes design, supply, installation & commissioning



Central Desalination Plant - Water Supply to Al Sharqia (Sur, Oman)

Complete SCADA, Control, Communication and Instrumentation package includes design, supply, installation, commissioning, and training for the complete scope.
Scope of Works includes:
- 2 main SCADA Centres.
- 6 main pumping stations with hot-standby RTU's.
- 22 pumping / filling station with RTU's.
- Installation and termination of Single mode-12 cores fiber Optic cables over 330 Km with 1Gbit/sec redundant network.



Solar Panel Absorption chiller for ADWEA Head quarters

The objective of the project is to heat the water using solar collectors (MCT type) up to 170-190 degrees Celsius and feed it to an absorption chiller which will give chilled water (7 degrees Celsius) output that can be connected to the building’s main chilled water supply and feed the central A/C system of the entire building.
Technical details:
a. Total number of MCT panels used: 54
b. Specialized piping works to withstand high temperature and pressure
c. Absorption chiller cooling capacity: 21 Tons



500 Km FOC network in Sewer line

Design, Construction and Maintenance of an Enterprise – wide Fiber Optic Cable Network Phase 1 Installation of 500 Km FOC network inside sewer lines in Abu Dhabi Island - Tender No. G-5719 - Sewer Fiber Project.



Mutla High storage and water distribution complex Project

Supply , installation, programming, termination, testing and commissioning complete I & C system ( DCS & instrumentations ) based on Siemens PCS7 and field



Construction of Moral Guidance & public Relations

Construction of Moral Guidance & public Relations - Supply, installation, testing and commissioning of complete electrical & low voltage scope



Emirates Engineering Hangar - Control Works

Emirates Engineering Hangar - Control Works SCADA, Control & Communication works for Emirates Engineering Hangar at the Dubai International Airport



Wadi Diqah Dam Project

Supply , installation, programming, termination, testing and commissioning SCADA System to collect the data form Existing instrument



Wadi Diqah Dam Project Phase II

Supply , installation, testing and commissioning new SCADA & CCTV Server in Ministry Building In Muscat and connect it the server with SCADA and CCTV system located in Wadi Diqah Dam Via MPLS network



Al Ain Water Transmission Scheme (AWTS)

Supply , installation, programming, termination, testing and commissioning complete I & C Scope.



Adam Ad Dakhliya SCADA and I&C 

Supply , installation, programming, termination, testing and commissioning complete I & C Scope



Additional Tanker filling Station for Al Sharqia

Supply , installation, programming, termination, testing and commissioning complete I & C Scope



Unit 4 - SCADA Center Upgrade

Replace The Existing SCADA system (Servers,Engineering & Work stations) by new one based on Siemens WinCC



Linking of Delma plant to main Delma Reservoir

D-6972- Construction of 119 Water House Connections, Supply , installation, programming, termination, testing and commissioning PLC and SCADA Workstation



Shuweihat Water Transmission – Abu Dhabi

Supply , installation, programming, termination, testing and commissioning complete I & C Scope



Al Yaif Water Transmission Scheme – Al Ain

Supply , installation, programming, termination, testing and commissioning instruments Scope



Reservoir 140 Jarf Area – Abu Dhabi

Supply , installation, programming, termination, testing and commissioning complete I & C Scope



100 Farms Area – Abu Dhabi

Supply , installation, programming, termination, testing and commissioning complete I & C Scope



Water Supply to Al Bahya & Al Sadar Areas - Abu Dhabi

Supply , installation, programming, termination, testing and commissioning complete I & C Scope



Al Kaleej Sugar - Revamping of DCS

Replace existing control system from ABB to SIEMENS



10 MG Water Reservoir and Pumping Station at Ajban - Abu Dhabi

Supply , installation, programming, termination, testing and commissioning complete I & C Scope



Shobaisi & Remah Pump station

Supply , installation, programming, termination, testing and commissioning complete I & C Scope



CIM 56-01 Al Ain Cement Factory – Al Ain

Supply , installation, programming, termination, testing and commissioning complete I & C Scope



Mahad Project

Supply , installation, programming, termination, testing and commissioning of one engineering station and one workstation based on Siemens WinCC , and one concentrator PLC based on Siemens S7 400 H PLC to make interface with three remote sites and send the data to Shenas SCADA center via GPRS